Using the Tivoli Dynamic Workload Console, what are two ways to change the priority of a job?()
- A、 Open the "Set Priority" panel from the job properties.
- B、 Change the priority of the job stream that contains the job.
- C、 Select the corresponding action from the Monitor jobs task panel.
- D、 Open the job stream properties and drill down to the job priority panel.
- E、 The priority of a job can only be changed from the Workload Designer.
正确答案:A,C
答案解析:有
微信扫一扫手机做题