多做题,通过考试没问题!

juniper认证考试

睦霖题库>其他计算机考试>juniper认证考试

You have been tasked with installing two SRX 5600 platforms in a high-availability cluster. Which requirement must be met for a successful installation?()

  • A、You must enable SPC detect within the configuration.
  • B、You must enable active-active failover for redundancy.
  • C、You must ensure all SPCs use the same slot placement.
  • D、You must configure auto-negotiation on the control ports of both devices
正确答案:C
答案解析:
进入题库查看解析

微信扫一扫手机做题