You have been tasked with installing two SRX 5600 platforms in a high-availability cluster. Which requirement must be met for a successful installation?()
- A、You must enable SPC detect within the configuration.
- B、You must enable active-active failover for redundancy.
- C、You must ensure all SPCs use the same slot placement.
- D、You must configure auto-negotiation on the control ports of both devices
正确答案:C
答案解析:有