多做题,通过考试没问题!

思科认证考试

睦霖题库>软件认证工程师考试>思科认证考试

You have just created a new VLAN on your network.  What is one step that you should include in your VLAN-based implementation and verification plan? ()

  • A、Verify that trunked links are configured to allow the VLAN traffic.
  • B、Verify that the switch is configured to allow for trunking on the switch ports.
  • C、Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
  • D、Verify that different native VLANs exist between two switches for security purposes.
正确答案:A
答案解析:
进入题库查看解析

微信扫一扫手机做题