An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
- A、An additional switch for the new HMC
- B、Asynchronous adapters on the new HMC
- C、The two 570 servers are directly connected to the new HMC
- D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
正确答案:A
答案解析:有
微信扫一扫手机做题