多做题,通过考试没问题!

思科认证考试

睦霖题库>软件认证工程师考试>思科认证考试

A company is experiencing network delays. The network administrator discovers that a worker in a location far from the MDF has connected an old 10BASE-T switch with redundant links to the existing network. How could this action be responsible for the impaired network performance?()

  • A、Connecting a host to the old switch has created a broadcast storm.
  • B、The 10BASE-T switch forced the entire network to be reduced to 10 Mbps operation.
  • C、The old switch does not support VLANs, which has disabled the VLAN configuration of the entire the network.
  • D、The old switch does not support full-duplex operation, effectively forcing half-duplex operation throughout the network.
  • E、Spanning Tree Protocol has elected the old switch as the root bridge, creating inefficient data paths through the switched network.
正确答案:E
答案解析:
进入题库查看解析

微信扫一扫手机做题