多做题,通过考试没问题!

微软认证考试

睦霖题库>其他计算机考试>微软认证考试

You have a server that runs Windows Server 2003 Service Pack 2 (SP2). The server has a backup tape drive installed. You need to schedule a backup to tape. The tape must be ejected when the backup job is complete. Which commands should you include in the scheduled task? ()

  • A、Devcon.exe and Poolmon.exe
  • B、Ntbackup.exe and Devcon.exe
  • C、Ntbackup.exe and Rsm.exe
  • D、Rsm.exe and Poolmon.exe
正确答案:C
答案解析:
进入题库查看解析

微信扫一扫手机做题