多做题,通过考试没问题!

思科认证考试

睦霖题库>软件认证工程师考试>思科认证考试

You are deploying two core switches, one in each building, 50 km away from each other. The cross-connection between them will be a Layer 2 2-gigabit EtherChannel with an 802.1Q trunk. You configured it correctly but the link does not come up. The port is in the "admin up" state, and the line protocol is in the "down" state. The fiber link is OK. What would be the most likely reason for the link not to come up?()

  • A、The switches are not the same model.
  • B、You are not using the correct SFP.
  • C、You are not using correct optical media converters.
  • D、Configuration should be modified, because the distance is longer.
正确答案:B
答案解析:
进入题库查看解析

微信扫一扫手机做题