多做题,通过考试没问题!

思科认证考试

睦霖题库>软件认证工程师考试>思科认证考试

You need to create a new VLAN on your Catalyst switch. This VLAN is to be named TESTKING. Which of the following need to be completed for the creation of this new VLAN?()

  • A、The TESTKING VLAN must be created.
  • B、The desired ports must be added to the new TESTKING VLAN.
  • C、The TESTKING VLAN must be added to all of the domains.
  • D、The TESTKING VLAN must be named.
  • E、An IP address must be configured for the TESTKING VLAN.
  • F、None of the above. VLAN creations are automatic.
正确答案:A,B,D
答案解析:
进入题库查看解析

微信扫一扫手机做题