多做题,通过考试没问题!

Oracle认证考试

睦霖题库>其他计算机考试>Oracle认证考试

The Automatic Database Diagnostic Monitor (ADDM) analysis runs every 60 minutes on your database. Your database is facing a series of interrelated problems over a period of two hours. You need to ensure that the ADDM analysis is run over a time span of two hours in future. What would you do?()

  • A、Create two custom ADDM tasks.
  • B、Modify the AWR snapshot time interval to two hours.
  • C、Create a new scheduler window for a time period of two hours.
  • D、Modify the Automatic Workload Repository (AWR) snapshot retention period to two hours.
正确答案:B
答案解析:
进入题库查看解析

微信扫一扫手机做题