Your network contains two data centers named Datacenter1 and Datacenter2. An Active Directory site exists for each data center. The data centers connect to the Internet by using a direct link. The data centers connect to each other by using a high-speed WAN link. You plan to deploy Exchange Server 2010 Mailbox servers in both data centers. You need to plan message routing to meet the following requirements:.Ensure outbound delivery of e-mail messages if a single server fails .Automatically load balance the Hub Transport server in each site .Deploy the minimum number of servers What should you include in the plan?()
- A、In each data center, deploy one Hub Transport server. Create and configure one Send connector.
- B、In each data center, deploy two Hub Transport servers. Create and configure one Send connector.
- C、In each data center, deploy one Edge Transport server. Create and configure two Send connectors.
- D、In each data center, deploy two Edge Transport servers. Create and configure two Send connectors.
正确答案:B
答案解析:有
微信扫一扫手机做题