It has become necessary to configure an existing serial interface to accept a second Frame Relay virtual circuit.Which of the following processes are required to accomplish this task?()
- A、configure static frame relay map entries for each subinterface network.
- B、remove the ip address from the physical interface
- C、create the virtual interfaces with the interface command
- D、configure each subinterface with its own IP address
- E、disable split horizon to prevent routing loops between the subinterface networks
- F、encapsulate the physical interface with multipoint PPP
正确答案:B,C,D
答案解析:有
微信扫一扫手机做题