Prior to a live disaster test also called a Full Interruption test, which of the following is most important?在现场灾难测试(一个完整的中断测试)之前,下面哪个是最重要的?()
- A、Conduct of a successful Parallel Test 一个成功的并行测试行为
- B、Restore all files in preparation for the test. 在准备测试中恢复所有的测试文件
- C、Document expected findings. 记录预期的结果
- D、Arrange physical security for the test site. 处理测试场地的物理安全
正确答案:A
答案解析:有
微信扫一扫手机做题