An administrator plans to apply a fix pack to the PowerHA software using a rolling migration. At what stage ofthe migration is a cluster verification supported?()
- A、Individually before each node is upgraded
- B、Individually before and after each node is upgraded
- C、Individually after each node has been upgraded
- D、Collectively after all nodes have been upgraded
正确答案:D
答案解析:有

微信扫一扫手机做题