A system must be upgraded from AIX 5.1 to 5.2. Which of the following scheduling processes should be performed? ()
- A、 Schedule enough down time to backup, upgrade and reboot.
- B、 Backup, upgrade, then schedule enough down time to reboot the system.
- C、 Backup, then schedule enough down time to upgrade and reboot the system.
- D、 No scheduling processes are necessary because no down time is required.
正确答案:A
答案解析:有