During a routine maintenance visit to a client, an administrator noticed that the last full backup did not complete. Which of the following should the administrator do FIRST?()
- A、Schedule and perform an incremental backup as soon as possible.
- B、Inspect backup report logs.
- C、Schedule and perform a full backup as soon as possible.
- D、Inspect alert notification settings.
正确答案:B
答案解析:有

微信扫一扫手机做题