Which two of these are correct regarding the recommended practice for distribution layer design based on the following configuration?()
- A、use a Layer 2 link between distribution switches
- B、use a Layer 3 link between distribution switches
- C、use a redundant link to the core
- D、use a Layer 3 link between distribution switches with route summarization
正确答案:C,D
答案解析:有
微信扫一扫手机做题